Kohler K-2009 Guia De Instalacion página 3

Ocultar thumbs Ver también para K-2009:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Preparation (cont.)
Cut out the template where indicated for the countertop opening.
Cut along the inside of the cutting line.
Position the template on the countertop to ensure clearance
between the lavatory, faucet, and backsplash.
Verify cabinet clearance beneath the countertop.
Trace around the template on the countertop with a pencil.
Kohler Co.
3
1018888-2-E
Tabla de contenido
loading

Tabla de contenido