Tile Redi Your Way Guia De Instalacion

Bandejas de ducha a medida
Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

Redi Your Way® Installation Guide 
Tile Redi® Custom Shower Pans 
 
To help guide you through the shower pan installation process, we have provided the following Installation Guide, 
which is intended to provide an easy to follow step by step process for the installation of your Redi Your Way® custom 
shower pan, whether you are an experienced professional or a first‐time novice. In connection with your custom 
shower base and shower project, please comply with the recommendations and standards established for such 
projects from time to time by the Tile Council of North America, Inc. 
 
INSTALLATION INSTRUCTIONS FOR REDI YOUR WAY® CUSTOM SHOWER PAN WITH PVC DRAIN 
 
1. Frame out shower stall area to shower pan dimensions. 
2. Sweep out any debris from sub floor. 
3. Test fit shower pan drain housing into subfloor bore hole.  DO NOT NAIL OR SCREW ANYTHING INTO THE PAN. DO 
NOT SAND, CUT, OR MAKE ANY CHANGES/MODIFICATIONS TO THE SURFACE OF THE SHOWER PAN WHATSOEVER. 
4. Make sure the shower pan is aligned properly and fits snuggly against the shower frame studs on all sides. 
5. This step depends on whether there is access to the drain connection from below the subfloor. 
a. If there is access from the subfloor below, then cut a section of PVC drain pipe which is long enough to extend 
below the subfloor and easily make a connection to the waste water pipe.  Brush PVC adhesive on the outside of 
the cut drain pipe and quickly insert into drain connection, and then be sure the drain pipe extends far enough 
below the subfloor so it can be conveniently connected to the waste water pipe following the installation. 
b. If there is no access from the subfloor below, then make sure the drain pipe stubbed up from the subfloor is 
adjusted to a height sufficient to fit properly into the shower pan drain connection (approximately 1 
the substrate floor).  Brush PVC adhesive on the drain pipe stubbed up from the subfloor, then quickly insert the 
stubbed‐up drain pipe properly into the shower pan drain. 
6. Using a ½" square notch trowel form a ½" thick Rapid Set or modified Thin‐set bed on the entire shower enclosure 
substrate, making sure to apply the Rapid Set or modified Thin‐set all the way to the edge of the drain bore hole.   
a. Please note: Do not place the Rapid Set or modified Thin‐set directly on a wood or Gyp‐Crete substrate. First, 
waterproof the wood or Gyp‐Crete substrate with a fluid applied waterproofing membrane or NO. 15 or No. 
30 roofing paper so the substrate does not absorb the water from the Thin‐set. 
b. For larger pans place (2) wood furring strips in the mud, place the pan on the wood furring‐strips and slide the 
pan into place at approximately a 45‐degree angle without the pan or the drain making contact with the Rapid 
Set or modified Thin‐set.   
7.
Carefully remove the wood furring strips if used and lay the shower pan into place.  Once in place, apply 
pressure or wiggle the pan a little to make sure the Thin‐set spreads out evenly under the pan so the pan 
makes proper contact with the Thin‐set.  This process will ensure that the Rapid Set or modified Thin‐set will fill 
in the footprint of the wood furring strips evenly. Using a level, make certain the shower pan is level on all sides 
to ensure proper water drainage.  If the pan is not level, put more pressure on the high side and wiggle a little 
more. Important:  DO NOT STEP INTO THE SHOWER PAN ONCE THE SHOWER PAN HAS BEEN SET AND LEVELED 
UNTIL THE THIN‐SET HAS CURED COMPLETELY 
8. Install the shower backer board and water proofing in accordance with the standards established by the Tile 
Council of North America, Inc. 
9. Seal and waterproof joint between backer board and the shower pan splash walls using Redi Flash® or 100% 
silicone, and then cover the joint with a fluid applied waterproofing membrane on the shower walls over the 
joint.  Allow the Thin‐set bed to dry in accordance with the instructions of the manufacturer. You are now ready 
to tile to the shower enclosure.   Only Rapid Set Thin‐set or any type of modified Thin‐set or Redi Poxy should 
be used to lay tile on the pan.   
10. Adjust the height of the drain as necessary to accommodate the floor covering. 
 
 
 
Copyright © 2018. Tile Redi Sales, LLC. All Rights Reserved 
 
 
 
7
/
" below 
8
 
 
Rev. 20180606 
loading

Resumen de contenidos para Tile Redi Your Way

  • Página 1 Redi Your Way® Installation Guide      Tile Redi® Custom Shower Pans    To help guide you through the shower pan installation process, we have provided the following Installation Guide,  which is intended to provide an easy to follow step by step process for the installation of your Redi Your Way® custom  shower pan, whether you are an experienced professional or a first‐time novice. In connection with your custom  shower base and shower project, please comply with the recommendations and standards established for such  projects from time to time by the Tile Council of North America, Inc.    INSTALLATION INSTRUCTIONS FOR REDI YOUR WAY® CUSTOM SHOWER PAN WITH PVC DRAIN    1. Frame out shower stall area to shower pan dimensions.  2. Sweep out any debris from sub floor.  3. Test fit shower pan drain housing into subfloor bore hole.  DO NOT NAIL OR SCREW ANYTHING INTO THE PAN. DO  NOT SAND, CUT, OR MAKE ANY CHANGES/MODIFICATIONS TO THE SURFACE OF THE SHOWER PAN WHATSOEVER.  4. Make sure the shower pan is aligned properly and fits snuggly against the shower frame studs on all sides.  5. This step depends on whether there is access to the drain connection from below the subfloor.  a. If there is access from the subfloor below, then cut a section of PVC drain pipe which is long enough to extend  below the subfloor and easily make a connection to the waste water pipe.  Brush PVC adhesive on the outside of  the cut drain pipe and quickly insert into drain connection, and then be sure the drain pipe extends far enough  below the subfloor so it can be conveniently connected to the waste water pipe following the installation.  b. If there is no access from the subfloor below, then make sure the drain pipe stubbed up from the subfloor is  adjusted to a height sufficient to fit properly into the shower pan drain connection (approximately 1  ” below  the substrate floor).  Brush PVC adhesive on the drain pipe stubbed up from the subfloor, then quickly insert the  stubbed‐up drain pipe properly into the shower pan drain.  6. Using a ½” square notch trowel form a ½” thick Rapid Set or modified Thin‐set bed on the entire shower enclosure  substrate, making sure to apply the Rapid Set or modified Thin‐set all the way to the edge of the drain bore hole.    a. Please note: Do not place the Rapid Set or modified Thin‐set directly on a wood or Gyp‐Crete substrate. First,  waterproof the wood or Gyp‐Crete substrate with a fluid applied waterproofing membrane or NO. 15 or No. ...
  • Página 2 Redi Your Way® Guía de Instalación       Tile Redi® Bandejas de Ducha a Medida    Para guiarlo a través del proceso de instalación de la bandeja de ducha, proveemos la siguiente Guía de Instalación, cuya  intención es describir un sencillo proceso paso a paso para la instalación de su bandeja de ducha a medida Redi Your Way®, sea  usted un profesional experimentado o un principiante. En relación a su base de ducha a medida y a su proyecto de ducha, por  favor cumpla con las recomendaciones y los estándares establecidos de tanto en tanto para dichos proyectos por el Tile Council  of North America, Inc.    INSTRUCCIONES DE INSTALACIÓN DE LA BANDEJA DE DUCHA CON DESAGÜE EN PVC REDI YOUR WAY®    1.  Prepare el área del cubículo de la ducha según las dimensiones de la bandeja de ducha.  2.  Barra cualquier tipo de escombro que haya en el subsuelo.  3.  Compruebe que la caja del desagüe de la bandeja de ducha quepa dentro del orificio del subsuelo. NO CLAVE NI ATORNILLE  NADA A LA BANDEJA. NO LIJE, CORTE NI MODIFIQUE LA SUPERFICIE DE LA BANDEJA DE NINGÚN MODO.   4.  Asegúrese de que la bandeja de la ducha esté adecuadamente alineada y la misma se ajuste cómodamente contra los  montantes del marco de la ducha en todos los lados.  5.  Este paso depende de si existe acceso a la conexión del desagüe desde debajo del subsuelo.  a.  Si existe acceso desde debajo del subsuelo, corte una sección del caño de desagüe de PVC que sea lo suficientemente  larga para extenderla desde debajo del subsuelo y realizar fácilmente una conexión a la tubería de aguas residuales.   Cepille el adhesivo PVC en la parte exterior de la tubería de desagüe cortada y rápidamente insértela en la conexión de  desagüe. Luego asegúrese de que la tubería de desagüe se extienda lo suficientemente debajo del subsuelo para que  pueda conectarse de modo conveniente a la tubería de aguas residuales, luego de la instalación.   b.  Si no existe acceso desde debajo del subsuelo, asegúrese de que la tubería de desagüe conectada desde el subsuelo  quede ajustada a la suficiente altura para que encaje de modo adecuado dentro de la conexión de desagüe de la  bandeja de la ducha (aproximadamente 17/8" debajo del sustrato).  Cepille el adhesivo en la tubería de desagüe  colocada desde debajo del subsuelo y luego inserte rápidamente la tubería de desagüe de modo adecuado dentro del  desagüe de la bandeja de la ducha.  6.  Con una llana dentada cuadrada de ½” forme una base de argamasa de ½” de Rapid Set Thin‐set o cualquier tipo de Thin‐set  modificado sobre la totalidad del sustrato de la ducha asegurándose de aplicar la argamasa hasta el borde del orificio de  desagüe.   ...
  • Página 3   Guide d'installation Redi Your Way®       Bases de douches personnalisables Tile Redi®     Afin de vous guider au cours de la procédure d'installation de la base de douche, nous vous fournissons ce guide  d'installation dont le but est de décrire une procédure d'installation pas‐à‐pas et facile à suivre de votre base de douche  personnalisable Redi Your Way®, que vous soyez professionnel ou débutant.  Dans le cadre de votre projet de douche et de  base de douche, veuillez respecter les normes et les recommandations concernant ce type de projets établis de temps à  autre par le Tile Council of North America (TCNA).    INSTRUCTIONS D'INSTALLATION DE LA BASE DE DOUCHE PERSONNALISABLE REDI YOUR WAY® À DRAIN EN PVC  1.  Encadrez la zone de la cabine de douche en fonction des dimensions de la base de douche.  2.  Balayez les débris du sous‐plancher.  3.  Procédez à l'ajustement du drain de la base de douche dans l'orifice du sous‐plancher.NE PAS CLOUER NI VISSER  DANS LA BASE. NE PAS PONCER, COUPER OU MODIFIER LA SURFACE DE LA BASE DE LA DOUCHE.  4.  Assurez‐vous que la base de douche soit correctement alignée et solidement ajustée contre les goujons du cadre de la  douche sur tous les côtés.  5.  Cette étape dépend de la présence d'un accès au raccordement de drainage par le dessous du sous‐plancher.  a.  S'il est possible d'y accéder par le dessous du sous‐plancher, coupez une section du raccordement de drainage en  PVC de manière à ce qu'il soit assez long pour se prolonger sous le sous‐plancher et pour qu’il soit raccordé  facilement à la conduite d'eau.  Appliquez l'adhésif PVC sur l'extérieur du tuyau de drainage coupé et l'insérez  rapidement dans le raccord de drainage. Assurez‐vous ensuite que le tuyau de drainage soit assez long sous le  sous‐plancher pour pouvoir être facilement raccordé à la conduite d'eau à la suite de l'installation.   b.  Si aucun accès n'est disponible par le dessous du sous‐plancher, assurez‐vous que le tuyau de drainage dérivé du  sous‐plancher est réglé à une hauteur suffisante pour être correctement raccordé au raccordement de drainage  de la base de douche. (approximativement 1 7/8po sous le plancher support).  Appliquez l'adhésif Rapid Set ou  n'importe quel type de thinset modifié PVC sur l'extérieur du tuyau de drainage dérivé du sous‐plancher, puis  insérez rapidement et correctement le raccord de drainage dérivé dans le drain de la base de douche.  6.  À l'aide d'une truelle de ½ po à dents carrées, formez un lit de mortier de ½ po d'épaisseur sur l'ensemble de  l'installation de support de douche de manière à s'assurer que le mortier soit bien appliqué tout autour de l'orifice du  drain.   ...