Lutron Energi Savr Node T Serie Guia De Instalacion página 8

Idiomas disponibles

Idiomas disponibles

T-Series Energi Savr Node
QS Link Wiring (continued)
Only terminals 1, 3, and 4 connected
between devices that supply PDUs
COM
MUX
MUX
Terminal 2 NEVER connected between
devices that supply PDUs
Devices that
supply PDUs
Terminal 2 (+24 V)
NEVER connected*
Terminal 2 (+24 V)
NEVER connected*
Terminal 2 (+24 V)
NEVER connected*
QS Link Wiring Rules
* Terminal 2 (+24 V) should NEVER be connected between devices that supply PDUs.
** For Quantum Hub wiring connection details, refer to the installation instructions for the specific Quantum
Hub model being used.
Lutron
8
|
|
Installation Guide
All 4 terminals connected to QS link
devices that consume PDUs
Devices that
consume PDUs
QS link;
all 4 terminals
T-Series ESN unit
QS link;
all 4 terminals
T-Series ESN unit
QS link;
all 4 terminals
Quantum
Hub **
COM
+24 V
MUX
MUX
QS Input/
Output
Interface
Wired QS
Keypad
Wired QS
Keypad
T-Series Energi Savr Node
Wired QS
Keypad
QSM
QS Input/
Output
Interface
Installation Guide
QSM
QSM
Wired QS
Keypad
loading