All manuals and user guides at all-guides.com
Chapter Two
This documents the features of the Type 260 PS-3B power supply.
How To Unpack the Type 260 PS-3B Unit
MKS has carefully packed the Type 260 PS-3B unit so that it will reach you in perfect operating
order. Upon receiving the unit, however, you should check for defects, cracks, broken
connectors, etc., to be certain that damage has not occurred during shipment.
Note
Do not discard any packing materials until you have completed your
inspection and are sure the unit arrived safely.
If you find any damage, notify your carrier and MKS immediately. If it is necessary to return the
unit to MKS, obtain an ERA Number (Equipment Return Authorization Number) from the MKS
Service Center before shipping. Please refer to the last page of this supplement for a list of MKS
Calibration and Service Centers.
Caution
Only qualified individuals should perform the installation and any
user adjustments. They must comply with all the necessary ESD and
handling precautions while installing and adjusting the instrument.
Proper handling is essential when working with all highly sensitive
precision electronic instruments.
Unpacking Checklist
Standard Equipment:
•
Type 260 PS-3B Unit
•
Type 260 PS-3B Supplement (this document)
Optional Equipment:
•
CB260-1-xx cable (where xx indicates the length) to connect the 260 PS-3B to a load
Chapter Two: Introduction
17
Introduction