Prior To Operation; Continuous Drainage - Haverland DES19 Manual Del Usuario

Ocultar thumbs Ver también para DES19:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Prior to Operation

• Supply power should be in correspondence with the value on the nameplate, power outlet needs to
be earthed.

Continuous Drainage

In general, water will be collected by the tank, if you want continuous drainage, please follow these
1. Unplug the drainage outlet plug.
2. Insert the drainage pipe with 19mm inner diameter into water outlet.
Please always make sure the pipe is facing down, that is not blocked or bended.
5
Tabla de contenido

Solución de problemas

loading

Tabla de contenido