King gates GO GREEN Instrucciones Y Advertencias Para La Instalación Y El Uso página 19

Kit solar fotovoltaico
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

11
04. Then pull the cable outwards from the socket and insert the seal
and washer (fig. 12 e 13). Lastly, tighten the cable clamp (fig. 14) us-
ing a wrench, to guarantee completely sealed closure.
12
13
14
05. After assembling the socket, position the seal supplied on the
connection side (fig. 15).
15
• STEP 6 – Assembly of the "pipette" socket in BLACK on the
power cable.
Proceed exactly as described in STEP 5 but with the "pipette"
socket in BLACK.
• STEP 7 – Connecting the photovoltaic panel to the battery
To connect the panel to the battery, proceed as follows:
01. Connect the GREY "L" type socket to the "IN" connector on the
battery (fig. 16);
16
4
02. To select the most suitable connection configuration for the con-
nection of all system devices, refer to the example shown in fig. 17.
Note – If frequent disconnection of the battery plug is envisaged, use
the screw in fig. 18. Otherwise use the screw in fig. 19.
17
18
• STEP 8 – Connecting the battery to the automation
CAUTION! – For safety reasons, the operations described in
Step 8 must be performed exclusively by a skilled and qualified
technician.
To connect the battery to the automation, proceed as follows:
01. Access the control unit of the automation and insert the power
cable connector in the buffer battery socket on the control unit. To
locate this socket, refer to the instruction manual of the automation
to be powered.
02. Connect the BLACK "L" type socket to the OUT connector on
the battery (fig. 20);
16
03. Fix the socket by means of the safety screws supplied, with ref-
erence to fig. 21. Note – If frequent disconnection of the connector
from the battery is envisaged, use the screw in fig. 18. Otherwise use
the screw in fig. 19.
21
IN
19
OUT
19
Tabla de contenido
loading

Productos relacionados para King gates GO GREEN

Tabla de contenido