DUCTWORK, WIRING LOCATIONS
1-1/4"
10-1/16"
TOP
MOUNTING
NOTE: Top
HOLE
mounting
screws MUST
DRILL 1/8"
engage wood
PILOT HOLE
support.
18"
9-7/16"
15-7/16"
Min.
BOTTOM
MOUNTING
HOLE
Installation Height
Align Bottom Edge With
Pencil Line Indicating
Bottom of Hood
Ceiling ducting:
NOTE:
dimension.
Wall Ducting:
centerline on the template.
HOUSE WIRING LOCATION:
hood.
side of the centerline.
Installation Instructions
Wall vent
C
installation
1-1/4"
TOP
MOUNTING
HOLE
NOTE: Top
mounting
DRILL 1/8"
screws MUST
PILOT HOLE
engage wood
support.
REAR WALL
MOUNTING TEMPLATE
15-7/16"
9-7/16"
C L
BOTTOM
MOUNTING
HOLE
Installation Height
Align Bottom Edge With
Pencil Line Indicating
Bottom of Hood
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT
Centerline of
installation
space
location. The horizontal support must be flush with
the room side of the studs.
sides of the support to secure to wall studs.
IMPORTANT:
surface.
9
Framing must be capable
View from rear
cleats
support