Installation - KERN PES-A02 Manual De Instrucciones

Idiomas disponibles
  • ES

Idiomas disponibles

1 Installation

1. Disconnect balance from mains, open housing
2. Unlatch rear cover and position relay output (see illustration)
3. Fix relay output with the two screws (M3 x 10, supplied as part of the delivery)
4. Remove display board by unscrewing the four screws (see illustration)
Connection CN 7
25 channel
5. Connect cable connection to display board (connection CN7)
10
All manuals and user guides at all-guides.com
Remove display board
Position relay output
PES-A02-IA-defsi-0610
loading