Input interface
Communication interface
Transit speed
Time for opening or closing
Starting time after power is on
Automatic reset time after fault
Working environment
Temperature
Relative humidity
Installation instruction
1.
Installation on the ground
First of all, earthwork (a concrete base foot of 200mm height for anti-humidity)
(Hereinafter called Safe island) should be built. Then, power cable of 220V3*1.5mm
and two 4*0.5mm control cable should be laid under the middle of the casework.
Fix the mechanism on the safe island by 4 bolts according to the installation dia-
gram. Connect it with power of 220V and control cable should be linked to con-
trol room.
Dry contact signal or +12V level signal
or pulse signal with width of more than
100ms DC12V, driving current: > 10mA
RS485(standard)
Distance less than 1200metres
40 persons/min(open often),
25-30 persons/min(close often)
2-3seconds
3 seconds
10 seconds
Indoor, outdoor( with a tent over)
-10°C ~ 50°C
≤90% no condensation
ENG
5