Powerware 9125 Guia De Instalacion página 9

Ocultar thumbs Ver también para 9125:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

UPS Battery
Connector
EBM Cable
EBM Battery
Connectors
Powerware
9125 Installation Guide for IBM Applications
®
4. If installing additional EBMs, repeat Steps 2 and 3 for each
cabinet.
EBM Bracket
5. Plug the EBM cable into the battery connector on the UPS rear
panel (see Figure 8).
6. If additional EBMs are to be installed, plug the EBM cable of the
second cabinet into the battery connector on the first EBM.
Repeat for each additional EBM. Up to four EBMs may be
connected to the UPS.
Communication Port
Figure 8. Typical UPS Installation (120V Model Shown)
05146789 A Uncontrolled Copy
S
Figure 7. Installing the EBM Brackets
Power Cord
Output Receptacles
Installation
EBM Bracket
Load Segment 2
Load Segment 1
5
Tabla de contenido
loading

Tabla de contenido