4.7 Fitting the toilet to the floor
• Attach the toilet using the fasteners supplied.
Do not overtighten.
4.8 Testing
• Switch on the main switch.
• Open the ball valve in the water supply pipe completely so that
there will be a sufficient supply of water for flushing.
Do not forget to open the shut-off valve in the outlet (if present).
• Press the 'NORMAL' button once and check
whether the cycle is carried out properly.
• Throw a few pieces of toilet paper into the bowl
and check the cycle again.
• Check that there are no leaks at any of the connections.
10
110136.03
W
arning
TMWBP
• Press 'ADD WATER' until the water lev-
el in the toilet bowl is about halfway
(about 9 sec).
• Throw a few pieces of toilet paper in
the toilet bowl and press 'PUMP OUT'
(about 6 sec) to pump the toilet emp-
ty.
• Press 'ADD WATER' to fill the bottom
of the toilet bowl with water (about 4
sec).
The times given can be used as refer-
ence times to check that the toilet is
working properly.
• Check that there are no leaks at any of the connections.
TMWBS
ADD WATER
PUMP OUT
ADD WATER
vetus® Electric Marine Toilets TM series