Spears TRUE UNION Instrucciones De Instalación

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

True Union Full Port 3-Way Ball Valve
Installation Instructions
U.S. Patent No. 6,260,819
These instructions cover general installation
for Spears
®
PVC & CPVC True Union 2000
Full Port 3-Way Ball Valves. All applicable
instructions & procedures should be read
thoroughly before starting. Suitability of
the intended service application should be
determined prior to installation. Plastic piping
systems should be engineered, installed,
operated & maintained in accordance with
accepted standards & procedures.
SPECIAL INSTALLATION INFORMATION
True Union type ball valves use removable end connectors. To avoid problems,
NEVER ASSEMBLE THE JOINT TO THE END CONNECTORS WHILE THEY
ARE ATTACHED TO THE VALVE CARTRIDGE.
Full Port 3-Way Ball Valves: Full Port 3-Way Ball Valve Have Shut off on
Horizontal Branch.
IMPORTANT: Read Precautions & Warnings for all Valve Installations at the
end of these instructions. It is absolutely necessary that all design, installation,
operation & maintenance personnel be trained in proper handling, installation
requirements and precautions for installation and use of plastic piping systems
before starting.
LUBRICATION WARNING: Some Lubricants, including vegetable oils, are
known to cause stress cracking in thermoplastic materials. Formulation
changes by lubricant manufacturers may alter compatibility of previously
acceptable materials and are beyond our control. Lubricants are not required
for installation of Spears
Valves.
®
INSTALLATION INSTRUCTIONS FOR SOLVENT
WELDING APPLICATIONS
STEP 1
1
THREADED CONNECTIONS
WARNING: SOME PIPE JOINT COMPOUNDS OR PTFE PASTES MAY
CONTAIN SUBSTANCES THAT COULD CAUSE STRESS CRACKING
TO PLASTIC. TRANSITIONS TO METAL PIPE REQUIRE THOROUGH
CLEANING AND DEGREASING TO REMOVE ANY PIPE THREAD
CUTTING OIL.
STEP 1
RECOMENDED SEALANT
OR
TAPE SEALANT
TAPE SEALANT
2-3 Wraps
3.5 Mil Thick
STEP 2
STEP 3
4
STEP 2
EP 2
FP-3WAY-0915
STEP 3
STEP 4
STEP 5
P 5
FULL INTERFERENCE FIT
End
Connector
O-ring
STEP
6
Choose Correct
Choose Correct
Primer &
Primer &
Applicater
Applicater
STEP 1
STEP 2
APPLY THREAD
SEALANT
½
Socket
NET FIT
Depth
PIPE
End
Connector
O-ring
Socket
Socket
Depth
Depth
x 4
x 4
PIPE
x 4
x 4
ONE-WAY
MOTION
2
FLANGED CONNECTIONS
5
STEP
7
x 4
x 4
STEP
8
STEP
9
STEP
10
Pressure test the system only after all solvent cement joints have fully
cured. If any leaks are found at End Connectors during pressure check,
tighten Union Nut 1/16 turn to stop the leak.
UNION NUT
STEP 3
3 3
1 1
2 2
4 4
Tighten bolts
in 5 ft. lbs.
increments
TU 2000 Industrial BV Lockout Handle Operation
PRECAUTIONS AND WARNINGS
CAUTION: The system must be designed and installed so as not to pull the
components in any direction. Pipe system must be cut and installed in such a
manner as to avoid all stress loads associated with bending, pulling, or shifting.
All piping systems must be supported.
CAUTION: BEFORE THE VALVE IS CYCLED, all dirt, sand grit or other
material shall be fl ushed from the system. This is to prevent scarring of internal
components; e.g. ball, cup, wedge, seats, etc.
WARNING: System should not be operated or fl ushed out at fl ow velocities
greater than 5 feet per second.
WARNING: All air must be bled from the system during the initial fl uid fi ll.
Pressure testing of the system must not be made until all solvent cement joints
have properly cured. Initial pressure testing must be made at approximately
10% of the system hydrostatic pressure rating to identify potential problems
prior to testing at higher pressures.
NOT FOR DISTRIBUTION OF COMPRESSED AIR OR GAS.
SPEARS
CORPORATE OFFICE
15853 Olden Street, Sylmar, CA
PO Box 9203, Sylmar, CA 91392
www.spearsmfg.com
© Copyright 2015 Spears
®
Printed in the United States of America 09/15.
x 4
x 4
PIPE
UNION NUT
ONE-WAY
MOTION
3
BOLT TORQUES
Valve Size
Torque Value
1/2" to 1-1/2"
12 ft. lbs.
2"
25 ft. lbs.
U.S. Patent No. 6,260,819
®
MANUFACTURING
COMPANY
91342
(818) 364-1611
Manufacturing Company. All Rights Reserved.
FP-3WAY-0915
loading

Resumen de contenidos para Spears TRUE UNION

  • Página 1 & maintained in accordance with accepted standards & procedures. SPECIAL INSTALLATION INFORMATION True Union type ball valves use removable end connectors. To avoid problems, NEVER ASSEMBLE THE JOINT TO THE END CONNECTORS WHILE THEY ARE ATTACHED TO THE VALVE CARTRIDGE.
  • Página 2 PASO PASO 2 SO 2 Válvulas de Bola True Union de 3 Vías de Tuberia Tuberia PIPE Paso Completo Instrucciones de Instalación Tuerca de UNION NUT Union Patente de EE. UU. No. 6,260,819 FP-3WAY-0915 Movimiento Estas instrucciones cubren la instalación general...

Este manual también es adecuado para:

Fp-3way-0915