Osmosis OSMOTIC ZERO Guía De Instalación Rápida página 11

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
INSTALLATION
STEP 1
Drill a hole in the
draining board with a
19 mm bit.
ANOMALIES
TAP LED
BUZZER
-
-
Intermittent (every 30 min for 1 min
every 20 sec).
Flashing
On opening the tap, intermittent until
amber
tap closed.
On opening the tap, continuous until
tap closed.
Steady
Continuous.
amber
Steady blue
STEP 4
Install the 5-way valve
into the cold water tube
(between the house tap
and the mains intake).
STEP 6
Install the equipment drain
coupling.
STEP 8
Connect the water recovery
(blue 5/16" tube) to the
5-way valve at the recovery
outlet.
STEP 10
Connect the water outlet to
the tap connector.
STEP 2
Pass the tap
through the hole
-
STEP 3
Assemble the tap with
the elements shown in
the figure and in
the same order.
STEP 5
Drill a hole in the sink drain
with a 7.2 mm bit.
STEP 7
Connect the 5-way valve
intake (blue 1/4" tube) to the
equipment entry connector
marked
STEP 9
Connect the drain to the
safety outlet using the red
tube.
STEP 11
Make the plumbing
connections to the
equipment and afterwards
connect it to the electricity
supply.
MOTIVE
Correct operation.
Filters worn out.
High TDS.
Permeate water deposit empty.
Deposit overflow.
Electrical failure or missing
component.
Tap water supply without
anomaly.
Tabla de contenido
loading

Tabla de contenido