The Webstone Air Separator should be installed at the point where the temperature is the highest (i.e. after the boiler and/or
heat exchanger) and the pressure is the lowest (i.e. before the pump suction). It is recommended that an expansion tank be
mounted before the pump suction as well.
The Air Separator must be installed in a straight run of horizontal piping and positioned precisely upright. Designated lengths
of straight piping before and after the unit are not required. Neither side is designated as an inlet or outlet; the fl ow may be
directed in either direction. Do not exceed a 50% water/glycol ratio in the system.
SERVICE INSTRUCTIONS
Regular maintenance of the unit is not required. However, over time debris may collect in the unit and impact performance.
Should this occur, use the following instructions to clean the unit.
CAUTION! System fl uid under pressure can be very hazardous. Before removing the vent head for inspection, reduce system
pressure to zero, or isolate the Air Separator from the system. Water temperatures above 100°F can also be very hazardous.
Allow the system to cool to below 100°F before proceeding. Keep body away from valve while open. Failure to follow these
instructions may cause serious bodily injury or property damage.
1. Using two strap wrenches, hold the upper body in place and remove the vent body cap ring, taking
care not to damage the o-ring. Lift up on the vent stem to remove the vent head assembly.
2. Use a mild detergent or water/vinegar solution to clean the vent head assembly.
If there is excessive build up, soak the vent head assembly in mineral spirits for several hours and then clean thoroughly.
3. If cleaning the coalescing material is also required:
While the vent head assembly is removed, remove the upper body by using two strap wrenches
on the lower and upper bodies of the air vent. Take care not to damage the o-ring.
4. Remove the coalescing medium from the lower vent body.
CAUTION! Coalescing Medium is very sharp
5. Rinse thoroughly with mild detergent or water/vinegar solution to remove any build up that may have occurred.
6. Examine the o-ring before installing on the air separator to ensure no damage has occurred.
7. Reassemble the air separator.
8. Return system to operating condition.
9. If system was completely drained, minimal manual bleeding may be required to
ensure the system is completely full of water and able to circulate.
ONE APPIAN WAY WORCESTER, MA 01610
P.O. BOX 59 WORCESTER, MA 01613
P: (800) 225-9529 • F: (800) 336-5133
www.webstonevalves.com
Press connection installation instructions.
FORM#PRAS0414
loading

Resumen de contenidos para Webstone Pro-Connect

  • Página 1 Press connection installation instructions. The Webstone Air Separator should be installed at the point where the temperature is the highest (i.e. after the boiler and/or heat exchanger) and the pressure is the lowest (i.e. before the pump suction). It is recommended that an expansion tank be mounted before the pump suction as well.
  • Página 2 Step 4 – Insert Pipe Insert the pipe into the Pro-Connect™ Press Air Separator and slowly turn the tube or product until pipe reaches fi tting stop. Water may be used as a lubricant if desired, HOWEVER NO OTHER LUBRICANTS MAY BE USED. Verify the tubing has been fully inserted into the valve by measuring the distance between the end of the product and the line drawn on the tubing in Step 3.
  • Página 3: Installation Instructions

    Press products are a quick, convenient way to connect copper pipes, and are compatible with popular press fi t tools. Pro-Connect Press products are manufactured with an EPDM sealing element installed at the factory. These fi ttings are designed for operating temperatures between 0°F to 250°F (-18°C to 120°C).
  • Página 4 Press sont une façon rapide et pratique de raccorder les tuyaux de cuivre et sont compatibles avec les outils de raccordement à pression les plus courants. Les produits Pro-Connect Press sont fabriqués avec un joint EPDM installé à l’usine. Ces raccords sont conçus pour des températures d’utilisation de -18 °C à 120 °C (0 °F à 250 °F).
  • Página 5: Prueba Del Sistema

    Webstone son una manera rápida y práctica de conectar tuberías de cobre, y son compatibles con las herramientas prensadoras más conocidas. Los productos de prensa de Pro-Connect se fabrican con un elemento sellante de monómero de etileno propileno dieno (EPDM, por su siglas en inglés) instalado en fábrica. Estos accesorios están diseñados para funcionar en temperaturas entre 0 °F y 250 °F (de -18 °C a 121 °C).