TYPICAL INSTALLATIONS
(continued)
4" ROUND
DUCT
SUSPENDED
CEILING
MATERIAL
SUSPENDED CEILINGS
Housing hung with wires - 3-point mount.
INSTALL THE HOUSING
New Construction
1. Choose the location for your fan/light in the ceiling. For
best possible performance, use the shortest possible duct
run and a minimum number of elbows.
HOLES
TAB
1-1/4
1
5/8
BOTTOM EDGE OF JOIST
2. Position mounting brackets against joist so that bottom
edge of housing will be flush with finished ceiling.
Additional positioning feature for 5/8", 1", &
1-1/4" thick ceiling material:
Holes in corners of housing are labeled with
various ceiling material thicknesses. Position
housing so bottom edge of joist is visible through
a matched set of holes. The housing is now in the
proper position for that ceiling material thickness.
Additional positioning feature for 1/2" thick
ceiling material:
Bend two tabs, on side of housing, 90
housing until tabs contact underside of joist.
Mark the keyhole slot on both mounting brackets.
MODELS 741BRNT • 741SNNT • 741WHNT • 741BRFLNT • 741WHFLNT
POWER
CABLE
MOUNTING
HOUSING
TAB
GRILLE
PAN
GLASS
LIGHT SHADE
0
outward. Lift
INSTALL THE HOUSING
(continued)
New Construction
3. Set housing aside and drive nails partially into joist at the
top of both keyhole marks.
4. Hang housing from nails and pound nails tight. To ensure
a noise-free mount, pound another nail through the top
hole of each mounting tab.
Existing Construction
1. Choose the location for your fan/light in the ceiling. For
best possible performance, use the shortest possible duct
run and a minimum number of elbows.
2. In attic, position mounting brackets against joist. Trace
outline of housing on ceiling material.
3. Set housing aside and cut ceiling opening slightly larger
than marked.
Page 2