gopart ATV Manual Del Usuario página 5

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 32
Head screw M6x45(#19)
Unassembly Gauge
How to attach to your ATV
Position the assembled spreader centered on either the front or rear luggage rack on
your ATV. Next using the included "J-Bolts", connect the rear cross bars to the luggage
rack cross bar closet to the seat or handlebars. Using the 2 included "Double J-Bolts",
attach the spreader to the luggage rack securing it to the outer most rail on the lug-
gage rack. Tighten all fasteners and cut any excessive bolt lengths that extend beyond
the nuts on the "U & J-Bolts" and smooth if necessary.
WARNING: Prior to each use, inspect the mounting hardware and the spreader to ensure the rigidity of the mount
by tightening any loose hardware either on the Spreader or Luggage Rack mounts.
OPERATION
If rate settings are not available, use the following procedure to calculate the setting
1
Determine how much material is to be applied per 1,000 sq/ft.
2
Measure off a distance of 50 feet, preferably on a paved surface such as a parking
lot.
3
Weight out enough of the material to be applied to fill the hopper at least half full.
Record the weight for future use.
4
With the unit mounted on the vehicle and the hopper at least half full of the mate-
rial to be spread, position the vehicle far enough before the beginning of the 50
foot test area so that the vehicle will achieve the desired speed before you reach
the starting line.
5
Set the rate setting stop at a position that you feel would be an appropriate setting.
6
Start the vehicle in motion and as you cross the starting line (of the 50 feet) move
the rate lever to the open position against the stop. Take care to be aware of what
is going on around you when maintaining control of the vehicle.
7
Continue from the starting line with the unit spreading the material. As you cross
the finish line, move the rate lever to the closed position.
8
Stop the vehicle and note the width of the spread path that as just completed.
9
Return to the start point and empty the remaining material from the hopper into
your weighing container and re-weight.
Wing Nut
M6 (#24)
Assembly Gauge
UK
5
Tabla de contenido
loading

Productos relacionados para gopart ATV

Tabla de contenido