Heatit Mat-120-010 Manual De Instalación página 7

Tabla de contenido
Commissioning (continued)
3. Connect the metal braid wire ( ground ) to the electrical box ground screw or ground copper conductor wire.
4. Attach the corresponding lead wires to the junction box using CSA Certified / UL Listed cable fittings. The 'line'
wire is identified by
black/white or ground wire(tinned copper braiding)
minimum
14 AWG supply conductors. Supply conductors shall be suitable for residential wiring according to local and
national
electrical codes.
3.HEATITMAT System
3.1 HEATITMAT Specifications
Cable Construction:
Rated Voltage:
Output:
Cable spacing:
Cable Diameter:
Conductor Insulation:
Outer Insulation:
Max. Ambient Temp.:
Min. Installation Temp.:
Cold lead
3.2 Thermostat Specifications (Thermostat is not included in the kit)
Functions:
Supply Voltage :
Maximum switching current :
Temperature control range :
Ambient range :
Floor temperature sensor :
3.3 HEATITMAT typical installations and applications
Twin conductor
120V,240V
12W/ ft² (130W/m2)±10%
3" (76.2mm)
1/8"-1/6" (3.2mm-4.2mm)
fluoropolymer
fluoropolymer or PVC
85℉(30℃)
40℉(5℃)
2-wire 16 AWG plus ground braid; 10ft (3m) length
On/Off control, digital display, 7-day programmable
120/240 V ±15%, 50/60 Hz
16 Amp
40 to 104°F (5 to 40°C)
32 to 104°F (0 to 40°C)
2-wire, 10-foot lead wire
5
. The Mesh System must be connected using
HEATITCABLE. COM