Checchi & Magli UNITRIUM Serie Manual De Uso Y Mantenimiento página 58

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Lifting the UNITRIUM DT
WARNING
During lifting watch out for the load swinging, as
the hook-up point is never perfectly at the centre of
gravity.
Lifting operations must be carried out using suitable
means for the load to be lifted, by qualified and author-
ised personnel in order to safeguard their own safety
and that of the other people involved in the operations.
UNITRIUM DT/2
UNITRIUM DT/3
UNITRIUM DT/4
UN41-0534AN
To lift the work vehicle, proceed as follows.
1) Before lifting check the stability of the harness.
English language
SAFETY INFORMATION CONCERNING HANDLING AND
UNITRIUM DT/5
UNITRIUM DT/2
UNITRIUM DT/6
INSTALLATION
The machine is equipped with lifting plates marked with
appropriate signs.
The illustration shows the points for lifting the work ve-
hicle.
The lifting procedure shown applies for all the work ve-
hicle models specified in the manual.
The UNITRIUM DT/5 - UNITRIUM DT/6 - UNITRIUM
DT/7 models must always be hoisted separately to avoid
damage to the frame and possible injury to persons in-
volved in the operations.
UNITRIUM DT/7
2) Strap up the work vehicle or separate units as shown
in the figure.
14
4
Use and maintenance
Tabla de contenido
loading

Tabla de contenido