Candy PVC 220 Instrucciones De Empleo E Instalación página 21

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALLATION - ELECTRICAL CONNECTION
CONNECTION TO THE TERMINALS ON THE TERMINAL BLOCK :
To proceed with the connection, you must adhere to the following instructions.
. Before making the connection, make sure that the installation is protected by a suitable
fuse, see table on next page, and that it is fitted with wires of a large enough section to
supply the appliance normally.
. Choose the supply cord in accordance with the recommendations in the table page 22.
. Turn the hob, with the glass side against the worktop, providing you have protected
the glass !
. Remove the cover located under the control knobs, fitted by 2 screws at the front.
. Pass the supply cord into the cover hole.
. Pass the supply cord into the clamp.
. Strip the end of each conductor of the supply cord on a 10 mm length, by taking
account of the requested length of the cord for the connection on the terminal block.
. The terminal block offers different types of connection.
So, in accordance with installation instructions and
with the help of shunt bars, fix the conductors as
shown on the chart page 22.
The shunt bars, placed on the Earth Terminal,
allow to make a bridge between two phases.
Note :
Please take care to ensure that the shunt
bars do not fall through the hole.
. Screw the cable clamp back.
. Screw the cover hole back.
Terminal block
with marks
1 2 3 4 5
Shunts bars
Earth
Terminal
Cord clamp
- 21
Tabla de contenido
loading

Este manual también es adecuado para:

Pvc 310Pvc 400

Tabla de contenido