Elements Of The Complete Installation - Gerreka RINO Guía Rápida De Instalación Y Programación

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
RINO
Quick installation and programming guide
This quick guide is a summary of the complete installation manual. The manual contains safety warnings
IMPORTANT
and other explanations which must be taken into account. The installation manual can be downloaded by
NOTE
going to the "Downloads" section at the Erreka website:
http://www.erreka-automation.com
Assembly levels (mm)

Elements of the complete installation

Unlocking
2
D138A
Unlocking for manual
operation:
• Insert the key (1) and
turn clockwise, without
forcing it.
• Turn the handle (2)
clockwise
270°,
through to the stopper
but without forcing it.
Electrical cabling
A: Main power supply
B: Flashing light
C: Photocells (Tx / Rx)
D: Pushbutton/wall key
E: Antenna
Photocells
SG.A: opening photocell: to
enable testing, place
DIP9 in ON.
SG.C: closing photocell: to
enable testing, place
DIP6 in ON.
E138D
Unlocking
Locking
2
Motorised operation
locking:
• Turn the handle (2) anti-clockwise 270°,
without forcing it.
• Turn the key (1) anti-clockwise and remove.
• Push the cylinder (3) inward and manually
move the gate to interlock it in the drive
mechanism.
English
3
D138B
9
Tabla de contenido
loading

Tabla de contenido