GE AEV05 Manual Del Propietario Y Instrucciones De Instalación página 10

Para sala
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation Instructions
PREPARE THE AIR CONDITIONER
4
(cont.)
C. Remove the backing from the accordion
seal (two short strips). Stick one sealing strip
respectively on the left side and right side of
the accordion panels, as shown.
D. Slide the free end of the accordion panel
into the side panel rails. Slide the panel
down. Be sure to leave enough space to slip
the top and bottom of the frame into the rails
on the cabinet.
NOTE: There is a right and a left accordion
panel. Be sure to use the proper panel for
each side.
Top mounting rail
E. Slide the left and right accordion panels into
the top and bottom mounting rails.
Top left
10
Bottom mounting rail
Top mounting rail
Top right
PREPARE THE WINDOW
5
Cut the window seal (2 long strips) to the proper
length. Peel off the backing and attach the seal
to the underside of the window sash.
INSTALL THE AIR CONDITIONER
6
IN THE WINDOW
A. Place the air conditioner on the sill with the
bottom mounting rail against its back edge.
Center it and close the window securely
behind the top mounting rail. It should be
level; about a 1/3 bubble will be the correct
case slant to the outside.
Type B screws
B. Extend the left and right accordion panels
to the vertical window sashes and attach,
through the holes in the panels, with 5 Type
B screws, as appropriate.
Sealing Strip
(with adhesive)
49-7810

Capítulos

Tabla de contenido
loading

Tabla de contenido