ACV BG 2000-S Serie Instalación, Funcionamiento Y Instrucciones De Servicio página 11

Ocultar thumbs Ver también para BG 2000-S Serie:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38
table OF cOrrective meaSureS
Fit lining in chimney
Set boiler T° higher
Check and clean chimney
Comply with local regulations on boiler room ventilation
Clean burner and boiler
Set room thermostat to desired temperature
Clear or replace the circulator
Set switch to Winter position or replace switch
Fill and vent the system and boiler properly
Open radiator valves or adjust thermostatic valves
Check that pipes and meter are suitable for the system
Replace boiler thermostat
Ensure electrical system complies with the regulations
Change fuses and find out what caused the problem
Keep within the ratings stated by ACV
Set the thermostat to the desired temperature or replace
Replace Summer/Winter switch
Replace On/Off switch
This is not normal, find the cause
Replace fan
Replace electrode or adjust properly
Insert connectors properly
Replace gas valve ensuring setting parameters are correct
corrective measures
This table may be used after instruction received at ACV
EN • 11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
662Y0000.B
Tabla de contenido
loading

Tabla de contenido