EN
11 INSTALLATION INSTRUCTIONS
Unscrew the four bolts and remove the outer cover from the
rear of the boiler.
Open the boilers doors. Remove the manual ash drawer.
Unscrew the bolts that attach the door and pull the lower
door down to remove it.
Remove the two nuts and take out the inner cover
and the seal.
Slot the inner compressor drawer
boiler, place the closing support
place tightening the screws
Fit the motor support
together with the insulating gasket
the shaft is centred as correctly as possible in the
hole in the gasket.
(18)
into the
(19)
and fix it in
(20)
.
(10)
to the rear of the boiler
(11)
, ensuring
21