Tin loading. ATTENTION!!!:
Be sure that the tins are placed in the central part
in regards to the compactor dish. If small tins must
be pressed, place them in horizontal position one
by the other and never one inside the other.
The press will be used exclusively to crush tin of
sheet steel of various sizes up to 25 Lt. The tin will
be open and empty. A removable dish on the
press catches any liquid overflow.
Can crusher and cardboard (Ref.40000315)
Paper Cardboard loading:
To be sure that there is the nylon rope to block the
paper ball.
Two guides guides accommodates the nylon rope
for packing. Proceed as follow:
A) To go on the two nylon ropes to connect the
two tops, for a length of 30/35 cm per top.
The tin compactor does not need any special
maintenance.
A periodical cleaning with self-cleaning cloth is
The tin compactor or some parts of it, in case of
accidental breaking or wearing, must be scra-
pped according to the current laws in matter of
7. HAW TO USE THE CAN CRUSHER
8. MAINTENANCE
9. WASTE DISPOSAL
- 12 -
B) Charge the crushing chamber part till the top.
C) Close the door and press using the actuating
lever .
D) Take the plate in rest position and full up again
the internal pressing part using the upper additio-
nal door.
E) Close de door and begin the pressing phase.
F) Repeat the operation till ball dimension that
you want.
G) Open the door and tie the compressed ball.
H) Cut the rope, close the door, and take the
pressing plate in rest position using the special
level.
I) Take off the ball according to the rules
L.626/89 about the loading manual movement.
recommended.
In particular, use dry lubricated air for air supply,
avoiding water particles in the air.
waste disposal. The metal parts can be re-used
after melting.
Insert the string into
the
apropriate
holes on the com-
pactor.
Fix the string to the
knobs.