2. INSTALLATION

NOTE: The weighing module must be connected to its appropriate weight indicator with the
cable coming from the load cell. The indicator, connected to the platform, can not be calibrated
if not powered.
It is the customer's responsibility to prepare and calibrate the indicator.
For any further detail, refer to the technical and operational manual, supplied with the indicator.
A) Unpack then product.
B) Remove the locking catch for the transportation (see section 5.3).
C) Level the platform by adjusting the adjustable feet. The stability of the platform is very important.
ALL THE CORNERS MUST REST IN A UNIFORM WAY. Carefully check that all feet fully rest on the
ground and that the platform, loaded on the corner, is not unstable (if a corner is not resting on the
ground its relative foot is easier to turn).
D) Connect the shielded cable from the load cell to the weigh indicator (refer to the indicator manual).
The cable must be free, so that the resistances are not energised, which could alter the measurement.
E) You need to ground the metallic structure of the platform, especially if you need to weigh materials
that, while handled, can cause electrical discharges (dust, plastic materials, etc.). If there are any
doubts, consult the reseller.
F) Perform the indicator calibration and setup as shown by the manual
G) MAKE SURE TO FOLLOW THE WARNINGS AT PAGE 4.
2.1 INSTALLING THE CSP38I COLUMN (FIG.1)
1. Lock column (2) to base (7) with the two fitted screws (10 and 3).
2. Screw nut on feet (8).
3. Screw the four feet (8) to the base (7).
4. Make the connecting cable, coming from the scale, run inside column (2) until you get it out from
hole.
5. Connect the cable to the terminal board referring to the indicator technical-user manual.
6. Lock column (2) to the support for the indicator (9 and 5) with the two fitted screws (11 and 5).
7. Set the weigh indicator (6) to the support (9) with screws (4). Make sure the cable, connecting the
scale, is stretched.
8. Set the column CSP perpendicular to the floor, by adjusting feet (8).
9. Thigh nut on feet (8).