Wood Stud Installation; Installing The Projector Mount - KlipXtreme KPM-400W Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Features
1) Adjustable mounting legs
Featuring four adjustable legs with a mounting slot, this mount can accommodate projectors with
multiple mount patterns.
Note: The assembly of the mounting legs will depend on the projector con guration. Take into
account that it may vary.
2) Ceiling plate
Can be easily installed either on a wood stud or concrete ceiling.

Installing the projector mount

Note: This projector mount features two di erent methods for routing cables. Simply slide your
projector cables through the openings on the top or on the side of the mounting plate. Please refer
to gure 1a and 1b below.
1a
A
1b
A

Wood stud installation

Step 1
- With an electronic stud nder, locate the ceiling stud closest to your desired location for the
KPM-400W.
- Once you identify the center of the ceiling stud, use the ceiling plate as a template and mark the
mounting hole locations with a pencil.
- Place the ceiling plate into position against the ceiling, aligning the mounting holes with the center
of the stud.
Step 2
- Remove the ceiling plate and set it aside.
- Next, drill a pilot hole in the center of each mark using a hand held drill and a 3/16˝ (4.5mm) drill bit.
Useful tip:
When a screw is driven into a material, such as wood, it can act as a wedge, generating outward
pressure which can cause the material to split. Drilling a small pilot hole into which a screw is then
driven, less 'wedging' takes place, thereby reducing the likelihood of the material being split. It
also prevents the screw head from getting sheared o by torque.
Tabla de contenido
loading

Tabla de contenido