7. Assembly
Fit the accumulator cover.
Close the controller door.
Take out the upper terminal insulation for the
hot water module SE30 from the accessories
GB
kit and remove the press cut for the connecting
leads hot water module times as per drawing
(Fig. 7.1).
Apply the post-worked insulation at the top of
the metal sheet of the SE30-Unit (Fig. 7.2).
Raise cover on the side handles, press against
the base frame, press the side panels of the
cover and lower the cover (Fig. 7.3).
The covering hood is now connected with the
base frame by both upper hooks.
For the final securing and ground connection
with the buffer vessel the covering hood has to
be screwed tightly with both M6x12 screws on
the left and on the right side (Fig. 7.4).
Finally both borings on the side of the base fra-
me (down left and right) as well as the borings
on the side of the covering hood have to be
obturated by plugs which are enclosed to the
accessories kit.
Fig. 7.1: Rework insulation
30
Fig. 7.2: Insulation apply
1
Fig. 7.3: Mounting the cover
remove 3x
press cut
Fig. 7.4: Cover screw
english
2
3