Installation - Wattio BAT Manual Del Usuario

Monitor inteligente de electricidad
Ocultar thumbs Ver también para BAT:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation

IT IS IMPORTANT THAT YOU OBSERVE SOME SIMPLE PRECAUTIONS:
Even if the installation is very simple, it is recommended the installation to be done by a
professional. Please read and act upon the important information on the following pages.
It is recommended to switch off the general energy supply system.
If you notice anything unusual about the electricity
supply such as loose wires, exposed cabling, burn marks,
holes in the insulating materials or damage to the meter,
stop immediately and report the findings to your supply
company.
Do not force or bend the cables at any point during installation.
To change the batteries it is recommended to switch off the general energy supply system.
INSTALLATION STEPS
The power grid must be disconnected for the BAT installation. It is recommended, the
installation to be done by a qualified professional.
Before going ahead with the installation process it is important to write down the code of the
BAT for its registration later on.
1. Remove the battery cover pull tab.
2. Open the electrical panel by unscrewing the protection panel.
NOTICE: for security reasons, this step must be executed far away from any
liquids.