Overview; Putting Into Operation - Venta AW902 Manual De Instrucciones

Ocultar thumbs Ver también para AW902:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 79

OVERVIEW

1
Display
2
On/off switch
3
Evaporator compartment
4
Water tank
5
VentWave disk stack
6
Water tray
7
Transport castors
8
UVC lamp (pre-installed)
9
Cable compartment
10 Hygiene disk (pre-installed)
11 Remote control

PUTTING INTO OPERATION

Attention! Ensure that the device is switched off during all actions and the
!
switching power supply is disconnected from the outlet!
1 Unpack the appliance, set it up and use the transport castors 7 to move it to the
place you want. To do this, lift slightly on the right-hand side. Remove battery
protection and protective foil from remote control 11.
2 Open evaporator compartment 3 and remove water tank 4.
3 Open water tank 4 and fill up to the MAX marker with cold water.
4 Close the water tank 4 securely.
5 Insert the water tank 4 into the water basin 6 and close the evaporator compart-
ment 3.
6 Adjust display 1 to the position you want (3 positions possible).
7 Adjust cable connector to the length you want by winding/unwinding in cable com-
partment 9. Note: Make sure the cable connector is firmly fitted into the appli-
ance!
Connect power plug to mains and switch appliance on using on/off switch 2 or
remote control 11.
It can take approx. 60 seconds for the appliance to start up and the red light
i
on the display to go out. You will be able to hear a noise (gurgling), which is not a
quality defect.
24
EN
1
2
3
4
5
6
7
AW902
11
8
9
10
Tabla de contenido
loading

Tabla de contenido