Option: Docking Buffers; Commissioning; Functional Test - Novoferm NovoDock L320e ECO Manual De Instalación

Ocultar thumbs Ver también para NovoDock L320e ECO:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

7. Docking Buffers
Docking buffers (not included in the leveller scope of supply).
Protect the docking platform and vehicles with suitable docking buffers. Docking forces in excess of 100 kN may require
special measures. Please ask your supplier or the manufacturer.
EN

8. Commissioning

8.1
Fittings
Remove the lifting eyes before commis-
sioning.
Remove the transportation immobilisers
and spacers.
Return parts that can be reused to the
manufacturer or supplier.
12
8.2

Functional test

Levellers are tested and delivered including
the hydraulic oil.
The following must be taken into considera-
tion during commissioning:
Check that the leveller platform and
the loading bay floor are at the same
height.
This installation manual must be given to the customer and kept safely during the entire period of use!
Make sure that the operators receive
instruction.
Perform a trial run.
When doing so, refer to the separate
manual for the controls.
Check that the leveller operates
smoothly and without excessive noise.
Have the safety features tested.
Tabla de contenido
loading

Tabla de contenido