WATER CONNECTION
Fit the supporting hooks and attach the assembly template, moving it up to the wall; fit all the pipes, starting
with the end pipe fittings already mounted on the template: system supply, system return, cold water, hot water,
any gas pipes and electric mains leads with room thermostat.
Once the pipes have been fitted, the end pipe fittings can be removed and ordinary caps fitted, ready for
hydraulic tests to be carried out. The template can be removed or, if left in place, will be embedded in the wall
once finishing operations have been completed (plaster and tiles); only the two supporting hooks will protrude
from the wall, as well as an opening for the connections. Attach the boiler to the hooks through the holes at the
back of the frame and push it up against the finished wall. Make the necessary hydraulic connections.
SUGGESTIONS ON HOW TO PREVENT VIBRATIONS AND NOISE IN SYSTEMS
- avoid using pipes of small diameter;
- avoid using tight elbows and sharp reductions in flow cross-section;
- hot flushing of the system is recommended to eliminate impurities originating in pipes and radiators
00(particularly oil and grease) that could risk damaging the pump.
LEGEND
Hot water Ø 1/2"
C
G
Gas Ø 1/2" - Ø 3/4" (see tap supplied
with the boiler)
Boiler water supply Ø 1/2" (cold)
F
AE Electrical supply
System delivery Ø 3/4"
M
System return Ø 3/4"
R
GS Holding hooks Ø10 mm.
NOTE: Provide female water connections.
600
476
62
GS
C
F
G
AE
126
226
304
382
452
522
62
R
M
33