Installation - LEGRAND KEOR LP Manual De Instalación

Ocultar thumbs Ver también para KEOR LP:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Note: The packing condition and the external outlook of the unit should be inspected carefully
before installation. Retain the packing material for future use.
Unpacking
1. Take the battery bank out of the PE foam.
2. Remove the packing materials.
Note: The battery bank module is approx. 39kg, be cautious when unpacking and lifting the
unit to avoid injury.
3. Standard Package includes:
a. DC connect cable
b. User's Manual
4. Accessories for Tower Mount
UPS
AS 3000 230V
AS 2000 230V
AS 1000 230V
16
®
1
DC
Connection
2pcs
1
2
2
3
3
1pcs

4 Installation

DC
Tabla de contenido
loading

Tabla de contenido