HINKLEY LIGHTING
33000 Pin Oak Parkway
Threaded Tube
Assembly
Ground wire
Bollard Mount
PVC
Nut
Bottom Plate
Ground wire
Avon Lake, OH 44012
Installation Instructions
Family: Atlantis | Item No. 55602
Start Here
Unpacking
1. Unpack the bollard and the glass from the box.
2. Remove the bollard mount, threaded tube assembly, and PVC pipe from the box.
Luminaire Mounting
Note: If your local code requires a frost line burial deeper than 12 inches, you may
purchase a 2 inch PVC pipe (sch. 40 or sch. 80) from a local supplier and cut to length
as a replacement to the provided PVC pipe.
1. Dig a hole about 12 inches or deeper, depending on your local code.
2. Feed the wires through the PVC pipe and insert it in the ground, make sure the
PVC is sticking out of the ground enough that the bollard mount will fit on top of the
PVC, and that the bottom of the bollard mount is level with the ground.
3. Fill in the hole around the PVC pipe.
4. Level the PVC pipe with a post level.
5. Feed the wires through the bollard mount and the threaded tube assembly, pull the
wires out through the wiring coupler.
6. Put the bollard mount on top of the PVC pipe.
7. Tighten the three set screws on the sides of the bollard mount.
Note: You may set the PVC in cast concrete. It is suggested using a longer PVC pipe
and conduit, that is not provided. Cut the PVC to height after the concrete is set.
Conduit connections can be made to the PVC pipe. UF-B cable is also acceptable.
All local and national electircal codes must be adhered to for proper installation.
Assembly
1. Wire the fixture wires and the main wires together using wire nuts. Put the silicone
glue, that's provided, in the wire nuts to waterproof. All connections must be housed
with in the lower section of the bollard and above ground.
2. For ground installation: screw the nut (supplied) onto the threaded tube to get the
correct height adjustment. This step is not needed for concrete or other hard
surface installations.
3. Unscrew the two screws from the top cover and remove the cover. Let the cover
hang over the edge of the fixture.
4. Slide the washboard plates up to access the bottom plate. Put the main body of the
fixture over the bollard mount and threaded tube assembly.
5. Rotate the fixture to the desired position.
6. Put the nut (supplied in the parts bag) on top of the threaded tube and tighten.
7. Insert the glass into the top of the fixture. Slide the glass holders in the fixture.
8. Insert the LED into the top cover, screw in the set screw to secure to the top cover.
Connect the wires with the quick connect.
9. Put the top cover back on and tighten the two screws.