Pad Pressure Adjustment - NSS CHARGER 2022 ABLT Instrucciones Originales

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Every 12 Months
(Every 1200 Hours)
Call your Authorized NSS distributor / Service
Station to have the following services performed.
Verify that all daily, weekly, monthly and quarterly
maintenance has been performed.
Repeat the maintenance requirements for 6 month
(600 Hours) at this time.
Gas Spring Service
ALWAYS secure Brush Head in the pad change
position using the strap provided before attempting
any maintenance or repairs to the gas spring or
spring rod guide assembly.
 There is a clip and ball stud at each end. Remove the
spring clip that secures the gas spring to the
machine. Then pull the gas spring off of the ball stud.
 Always be sure the securing clip is reinstalled when
replacing the gas spring.
 Place one end of the gas spring against a hard
surface and push on it. If you can compress it, it must
be replaced. If you cannot compress it, it is most
likely OK.

Pad Pressure Adjustment

The NSS Charger 2022 ABLT is preset at the factory
for medium duty applications. It can be tuned to
your specific application for optimum performance.
ONLY an authorized NSS Service Station should
perform this adjustment.
Tools required for Pad pressure adjustment
1) ¾" open end wrench
2) Clamp on Amp Meter
 It is necessary to use a clamp on AMP Meter when
adjusting the pad pressure.
 There are many different manufactures and models of
AMP Meters to choose from. Two AMP Meters are
shown above. The one on the left is AMPROBE
Model ACDC-610 and the one on the left is
AMPROBE Model ACDC-400.
Tabla de contenido
loading

Tabla de contenido