Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

OWNER'S GUIDE
USE AND CARE MANUAL
CF2300 Series Industrial
Fan Evaporative Air Cooler
U.L. Listed evaporative cooler for non-ducted, low static
pressure installations in industrial or warehouse applications.
Safety
Installation
Start-up
Congratulations: You have purchased a product of superior performance and design, which
will give the best service when properly installed, operated and maintained.
This guide will provide you and your installer with the information needed to mount, operate,
inspect, maintain, and troubleshoot your Industrial Fan evaporative air cooler.
The first section, Installation and Start-Up, is especially for the installer. The second section, Regular Maintenance, contains operational and maintenance
instructions for the owner and/or maintenance operations personnel, while Troubleshooting includes information on commonly encountered problems.
Read all instructions carefully before installation.
Use only the fan motor and circulating pump
combinations marked on the Model Nameplate indicating
suitability for use in this model. Any other motors or
pumps cannot be substituted.
Installation work and electrical wiring must be done by
qualified person(s) in accordance with all applicable
codes and standards, including fire rated construction.
When cutting or drilling through a roof or ceiling, do not
damage electrical wiring or other concealed utilities
(water or gas lines, sewer lines, etc.).
Cooler motor, pump, cabinet and junction box must be
grounded in accordance with all local and national codes.
A ground wire must be used between the power supply
and the cooler.
Be sure that the cooler is connected to proper line voltage
stamped on the pump and fan motor specification plate.
NOTE: Improper voltage will void the pump and/or motor
warranties and may cause serious personal injury or
property damage.
Do not operate this fan motor with any solid-state speed
control device.
CONTENTS
Installation and Start-up
Mounting requirements
Location and placement
Duct system
Air Exhausting
Operation
Maintenance
Trouble Shooting
WARNING
SHOCK, OR INJURY TO PERSONS, OBSERVE THE FOLLOWING.
Electrical requirements
2
2
2
Overflow standpipe installation 4
2
Water line connections
2
Bleed off installation
P
HOENIX
INSTALLER: Please deliver this guide to owner.
- TO REDUCE THE RISK OF FIRE, ELECTRIC
Always disconnect electrical power to unit before
working on or servicing cooler. More than one
disconnect switch will be required to de-energize the
equipment for servicing.
Do not remove pad frames while cooler is running, this
may cause the fan motor to overload and damage the
motor windings.
NOTE:
Do not locate unit near exhaust or vent pipes as
odors or fumes may be drawn into cooler.
Use of anode devices, chemical additives or
treatments in this cooler will void the warranty.
Your warranty does not cover shipping damage.
Report all shipping damage at once to dealer or
carrier making the delivery.
For future reference, record the model, serial
numbers and installation date of your evaporative
cooler here:
Model #
Serial #
Install Date:
3
3
3
Start-up Checklist
Cabinet Checklist
Maintenance
4
4
Cleaning
M
I
ANUFACTURING,
NC.
Draining and touch-up
4
4
4
General Wiring Diagrams
5
1-999-2059 DATE: 3/04
5
5
6
6
7
8
Tabla de contenido
loading

Resumen de contenidos para PMI CF2300 Serie

  • Página 1: Tabla De Contenido

    OWNER’S GUIDE USE AND CARE MANUAL HOENIX ANUFACTURING, CF2300 Series Industrial Fan Evaporative Air Cooler U.L. Listed evaporative cooler for non-ducted, low static pressure installations in industrial or warehouse applications. Safety Operation Installation Maintenance Start-up Trouble Shooting Congratulations: You have purchased a product of superior performance and design, which will give the best service when properly installed, operated and maintained.
  • Página 2: Introduction

    INTRODUCTION Read This Manual Completely Before Installing NOTE: When coolers are installed within the jurisdiction of the City of Los Angeles (C.O.L.A.) Building codes, it is required that any electrical Your Industrial Fan Evaporative Cooler. components (motors, pumps, motor starters, etc) used in a C.O.L.A. installation shall be either: Your evaporative cooler is a well crafted unit built using decades of constant engineering research and product development to create an...
  • Página 3: General Wiring Requirements

    INSTALLATION Electrical Ground CAUTION: Disconnect all electrical power to the cooler For maximum safety, make sure cooler cabinet, blower motor and before attempting to install, open, or service your cooler. pump(s) are properly grounded to a suitable ground connection as More than one disconnect will be required to de-energize required by all local and national codes.
  • Página 4: Belt Adjustment

    Control Circuit Transformer If required, a control circuit transformer shall be a N.E.C. Class 2 transformer of adequate capacity, installed and protected in accordance to national and local codes. Belt Adjustment CAUTION : Disconnect all electrical power to the cooler and insure that belt is not rotating before adjusting belt tension.
  • Página 5: General Inspection

    GENERAL INSPECTION Maintenance Schedule Regular maintenance and periodic inspection is the key to long and Initial Start-up or Annual Inspection successful service from your Industrial Fan Cooler. The cooler should receive major servicing at least once a year, more often if conditions require (dusty environment, constant use, poor water quality, etc.) For CAUTION: Disconnect all electrical power to the cooler...
  • Página 6: Lubrication

    Changing Cooler Pads Cleaning Water Pump & Hose CAUTION: CAUTION: Disconnect all electrical power to the cooler Disconnect all electrical power to the cooler before attempting to install, open, or service your cooler. before attempting to install, open, or service your cooler. More than one disconnect will be required to de-energize More than one disconnect will be required to de-energize the equipment for servicing.
  • Página 7: Wiring Diagram

    WIRING DIAGRAM Single phase - 120, 208 or 240 Volt Fan Motor Circuit Single phase 120 Volt GFCI-protected Pump Circuit NOTE: THE SUPPLY CORD & PLUG ARE FACTORY INSTALLED ON THE PUMP AND ALL SINGLE PHASE FAN MOTORS. MAKE FIELD WIRING CONNECTIONS INSIDE JUNCTION BOX AS SHOWN FOR PUMP AND FAN MOTOR TO COMPLETE UNIT ELECTRICAL ASSEMBLY.
  • Página 8: Troubleshooting

    Troubleshooting: The following guide is intended to help you diagnose and fix some of the most commonly encountered problems; by no means does this guide cover all of the possible problems you may encounter. If you cannot diagnose and correct the problem, or if it persists, contact qualified service personnel.
  • Página 9 GUÍA DEL PROPIETARIO MANUAL de USO y CUIDADO HOENIX ANUFACTURING, CF2300 Series Industrial Ventilador Enfriador Evaporativo Enfriador listado por U.L para instalaciones sin ductos, de baja presión estática en aplicaciones industrials y de almacenaje. Seguridad Operación Instalación Mantenimiento Incio Trazando Fallas Felicitaciones: Usted acaba de comprar un producto de superior rendimiento y diseño, que la dará...
  • Página 10: Introducción

    INTRODUCCIÓN Lea Este Manual Completamente Antes de NOTA: Cuando los enfriadores son instalados dentro de la jurisdicción de los códigos de edificación de la Ciudad de Los Ángeles Instalar su Enfriador Industrial Ventilador. (C.O.L.A.), y también requieren componentes eléctricos (motores, bombas, interruptor de arranque, etc.) usados en C.O.L.A.
  • Página 11: Instalacion

    INSTALACION Tierra eléctrica Para máxima seguridad, asegúrese que el gabinete, motor y la PRECAUCION: Desconecte toda la corriente eléctrica bomba(s) está propiamente conectadas a una conexión de tierra del enfriador antes de intentar instalar, abrir, o darle adecuada como lo requieren todos los códigos locales y nacionales. servicio a su enfriador.
  • Página 12 Transformador para el control del circuito Si se requiere, un transformador para el control del circuito debe ser N.E.C. clase 2 de capacidad adecuada, instalado y protegido de acuerdo con los códigos locales y nacionales. Ajuste de banda PRECAUCION: Desconecte toda la corriente eléctrica hacia el enfriador y asegúrese que la banda no este dando vueltas antes de ajustar la tensión.
  • Página 13: Inspeccion General

    INSPECCION GENERAL Lista de mantenimiento Mantenimiento regular e inspecciones periódicas son la clave de un Lista de inspección de pre-comienzo o anual bueno y prolongado servicio de su Ventilador Evaporativo Industrial. El enfriador debe recibir servicio completo a menos una vez por año y PRECAUCION: Desconecte toda la corriente eléctrica más seguido si las condiciones lo requieren (ambiente polvo, uso...
  • Página 14 Cambiando los filtros (aspen) Limpieza de la bomba y manguera PRECAUCION: PRECAUCION: Desconecte toda la corriente eléctrica Desconecte toda la corriente eléctrica del enfriador antes de intentar instalar, abrir, o darle del enfriador antes de intentar instalar, abrir, o darle servicio a su enfriador.
  • Página 15: Diagrama De Alambrado

    DIAGRAMA de ALAMBRADO Monofásico - 120, 208 o 240 Voltios Circuito del Motor del Abanico Monofásico 120 Voltios con Protección GFCI Circuito de Bomba NOTA: EL CORDÓN DE SUMINISTRO Y CLAVIJA SON INSTALADOS EN LA FÁBRICA EN LA BOMBA Y TODOS LOS MOTORES MONOFÁSICOS.
  • Página 16: Trazando Fallas

    Trazando fallas: La intención de la siguiente guía es el de ayudarle a diagnosticar y reparar los problemas más comúnmente encontrados: De ninguna manera esta guía cubre todos los problemas posibles que usted encuentre. Si no puede diagnosticar y corregir el problema, o si persiste opóngase en contacto con personal de servicio capacitado.

Tabla de contenido