STEP 3: Attach Connect Poles to Support Legs
1.
As per Pic.5, assemble a Connect Pole onto the top of leg and locked by a Carriage
Bolt M6X35 and a Wing Nut M6.
2.
Use the same way to assemble the other Connect Pole. See Pic. 6.
STEP 4: Attach U-Handle to Connect Poles
1.
As per Pic.7, connect the Handle with Connect Pole, locked by a Hex Bolt M6X30
and a Wing Nut M6 on the left.
2.
On the right, insert the Adjustable Wire into the hole of Index plate, then assemble
the Index plate on the handle and Connect Pole by using Hex Bolt M6x30, Lock Nut
M6 and Wing Nut M6.
3.
Assemble Wire Crip Bottom Plate on the Connect Pole by using Hex bolt M6x30 and
Lock Nut M6。
4.
Use the Wire Grip Plate press the Adjustable Wire and Wire Crip Bottom Plate by
using Screw M5x10 and Lock Nut M5. See pic. 8.
5.
Tighten all hardware before operating the drop spreader.
Note: The flow controls handle needs to be on the outside of the U-handle.
UK
7