iHealth EGS-2003 Guia De Inicio Rapido página 6

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25
6. Read the test results
Quickly apply the blood sample to the absorbent hole of the
1
test strip. Make sure the con rmation window of the test strip
is completely lled with the blood sample.
The meter begins to count down from 5 to 1 when the blood
2
sampling port is full. The test result will appear on the display.
Caution: If the blood sampling port is not lled completely,
do not add more blood to the test strip, discard the test strip.
Insert a new test strip before measuring.
Tabla de contenido
loading

Este manual también es adecuado para:

Egs-2043

Tabla de contenido