4 - Fit the clamps as in the figure locking them in position
with the washer and the M10 hexagonal head screw.
Fold them according to the foundation.
5 -Carry out the excavation in the ground with the meas-
urements indicated in the image alongside and prepare a
suitable draining foundation.
Insert the foundation case in the excavation.
Attention: The case must rest on the bottom of the ex-
cavation and must be perfectly vertical - check this by
placing a spirit level on the upper flange.
Attention: Make sure, during the cast, that the fixing plug
you find under the cramp-iron is completely covered
with concrete.
Using a spirit level, check if the flange plane is horizon-
tal.
6 - After installing the foundation case, make sure you close
the hole with an adegate plug until the time you install the
bollard, in order to avoid accidents to to people or things.
See figures alongside.
Assembly instructions - RANGER 500
Drainage pipe min. diam. 10mm
Hole 800x800x1000 mm with draining foundation
GB
400
Cement
300
Fine
Sand
300
Gravel
RANGER 11