GE GXK285JBL Manual Del Propietario Y Instalación página 6

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALL THE CONTROL VALVE
(continues)
3. With wire routed under rubber gasket and
locking nut (as shown below) thread nut at least
3/4 toward bottom.
Rubber Gasket
Locking Nut
Wire
4. With "F" port label facing toward you (wire
groove facing back of cabinet) insert control
valve up through hole in sink/countertop.
5. Install 2nd rubber gasket on the control valve.
Insert decorative nut on top of control valve
turning fully until it stops, approximately two
turns of nut. Do not overtighten.
6. Turn locking nut clockwise to tighten until
it is firmly secure against underside of sink/
countertop. Do not allow control valve body
to rotate, "F" port label should face toward you
after locking nut is tight.
Control Knob
Decorative Nut
Rubber Gasket
Locking Nut
NOTE:
"F" facing toward you.
Installation Instructions
Rubber Gasket
Wire
6
INSTALL THE CONTROL VALVE
(continues)
7. Insert control knob into valve body.
NOTE: Knob only inserts in one position, rotate
slowly until you feel it drop slightly into place.
Then push down firmly to snap in place.
8. Check knob rotation. Knob should rotate 180
degrees and point towards you as it rotates left/
right. If point of knob rotates towards wall, then
unit is installed backwards. Please review step 2.
9. Connect wire to timer box.
10. Find suitable location for timer box and battery
access. Mount timer box to side of wall or
cabinet with two screws (and drywall anchor)
provided. NOTE: Be careful not to pinch or
screw through the wire.
11. Install two AA, 1.5 volt, batteries into timer box.

Capítulos

Tabla de contenido
loading

Tabla de contenido