Electric Connections - PSA Zodiac Sirocco 110 Serie Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 10
SPECIFIC CONNECTION TO SIROCCO 110 THREE-PHASE 400V-3N-50 HZ
1. Access to electric box
Remove body:
1
One screw on both sides

2. Electric connections

• the electrical supply of the dehumidifier must come from a protection and switching device (not
supplied) complying with the standards and regulations in force in the country (in France : NF C
15100).
• supply cable section: this section is recommended for cables of a maximum length of 20 metres,
with a calculation base of 5A/mm². It must be checked and adapted if necessary, depending on
installation conditions:
Model
without option or
hot water battery
Sirocco 110
three-phase
back up heating
• electrical protection: 30 mA differential circuit breaker (at the head of the line)
Sirocco 110 in three-phase 400V-3N-50Hz terminal board:
(see Sirocco single-phase instructions)
2
Adjustable screws to put
the dehumidifier of level
Option
Voltage
400V-50Hz-
400V-50Hz-
4.5 kW
Main supply
(see table above)
Control terminals
Remove these 5 screws
Nominale
current
consumed
2.8 A
9.3 A
contact "normally open"
remote control to boiler
(to used with hot water battery option)
1
3
Maximale
current
Cable section
consumed
3.8 A
5 x 2.5 mm²
10.3 A
5 x 2.5 mm²
Main supply 230Vac for
or
circulator
5G2.5
5G2.5
Tabla de contenido
loading

Productos relacionados para PSA Zodiac Sirocco 110 Serie

Tabla de contenido