English
EN
USER WARNINGS
Upon receiving the product, please verify that it doesn't have any type of fl aw, scratch, dent, etc, that it is in perfect
condition, and ready for its installation. All our products are submitted to a rigorous quality testing system before
being supplied.
Before tiling or installing any type of material on or above the shower tray, verify that it has been installed correctly
and check that it drains perfectly.
The installation must be carried out by qualifi ed personnel, and in compliance with current local standards. The
manufacturer refuses any responsibility for inconveniences caused by an improper installation or use, and will not be
liable for any costs derived from the substitution of glass enclosures, tiling or any other type of material.
INSTALLATION
See pages 4 and 5.
1. Check the product.
2. Material supplied.
3. The area where the shower tray is to be installed must be perfectly level. Respect drying times for cement base.
Do not use any type of adjustable prop or footing.
4. Mark valve position and install.
5. Check tray drains correctly.
6. Clean installation base and rear of showertray
7. To ensure a strong bond between the shower tray and the underlying base, use a fl exible two component
polyurethane R2 / R2T adhesive, according to EN 12004:2008+A1:2012 (Hidrobox recommends Keralastic T,
Ultrabond ECO PU 2K by Mapei). To guarantee a correct application, prior to its use, read the technical specifi cations
supplied with the adhesive, failure to do so may lead to the appearance of adhesion related problems between the
shower tray and its base.
8. Expansion joints. The expansion joint must be a minimum of 3 mm.
9. Protecting the showertray.
10. Installing the grid.
11. Sealing the perimeter joint and drying time.
8