Evacuating Products Of Combustion - Beretta IDRABAGNO 11 ESI Manual De Instalacion Y Uso

Ocultar thumbs Ver también para IDRABAGNO 11 ESI:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 47

3.4 Evacuating products of combustion

For information on evacuating the products of combustion, please refer to
regulation in force. The fl ue gas outlet/air intake kit is not supplied with the
boiler as accessories for sealed-chamber forced-draught appliances, which
better adapt to the installation context, can be used.
To extract the fl ue gas and restore the combustion air in the boiler, use
original tubes or others with the same characteristics which are CE certifi ed
and ensure that they are correctly connected as indicated in the instructions
provided with the fl ue gas accessories.
More than one appliance can be connected to the same exhaust fl ue, as
long as they are all of the sealed-chamber type.
The boiler is a type C appliance (with a sealed chamber) and must there-
fore have a secure connection to the fl ue gas outlet pipe and combustion
air intake pipe which both fl ow outside, and without which the appliance
cannot operate.
"FORCED OPEN" INSTALLATION (B22-B52)
The fl ue gas outlet pipe can be pointed in the direction most suited to the
specifi c installation needs.
To install, follow the instructions supplied with the kits.
In this confi guration, the appliance is connected to the 80 mm Ø fl ue gas
outlet pipe using a 60-80 mm Ø adapter (fi g. 1).
In this confi guration the combustion air is withdrawn from the room
where the appliance is installed, which should be technically suitable
and ventilated.
The fl ue gas outlet pipes which are not isolated are potential sources
of danger.
When necessary, the fl ue gas fl ange (C) is to be removed by lifting it using
a screwdriver.
The table shows the straight lengths allowed.
On the basis of the length of the pipe used, one of the fl anges
provided should be inserted (see table).
11 ESI
pipe length
fl ue gas fl ange
(m)
up to 1,5
from 1,5 to 5
from 5 to 14
(*) installed on the boiler
13 ESI
pipe length
fl ue gas fl ange
(m)
up to 2
from 2 to 8
from 8 to 25
(*) installed on the boiler
17 ESI
pipe length
fl ue gas fl ange
(m)
up to 1
from 1 to 4
from 4 to 8
from 8 to 20
(*) installed on the boiler
COAXIAL OUTLETS (60-100 Ø)
The boiler is supplied set up to be connected to coaxial inlet/outlet pipes,
and with the air intake vent (D) closed (fi g. 2).
Coaxial outlets can be pointed in the direction most suited to the specifi c
installation room, in line with the lengths shown in the table.
Follow the installation instructions supplied with the kit.
When necessary, the fl ue gas fl ange (C) is to be removed by lifting it using
a screwdriver.
The table shows the straight lengths allowed.
On the basis of the length of the pipe used, one of the fl anges
provided should be inserted (see table).
load loss
of each bend (m)
(C)
45°
Ø 39
Ø 41 (*)
1,2
Ø 43
load loss
of each bend (m)
(C)
45°
Ø 42
Ø 44 (*)
1,2
Not installed
load loss
of each bend (m)
(C)
45°
Ø 41
Ø 43 (*)
1,2
Ø 45
Not installed
IDRABAGNO 11-13 ESI
IDRABAGNO 17 ESI
90°
1,7
90°
1,7
11 ESI
pipe length
(m)
up to 0,85
from 0,85 to 2,35
90°
from 2,35 to 4,25
(*) installed on the boiler
1,7
13 ESI
pipe length
(m)
up to 0,85
from 0,85 to 2,35
from 2,35 to 4,25
(*) installed on the boiler
17 ESI
pipe length
(m)
up to 0,85
from 0,85 to 1,70
from 1,70 to 2,70
from 2,70 to 3,40
(*) installed on the boiler
D
fi g. 1
D
fi g. 1
fl ue gas fl ange
of each bend (m)
(C)
45°
Ø 39
Ø 41 (*)
1
Ø 43
fl ue gas fl ange
of each bend (m)
(C)
45°
Ø 42
Ø 44 (*)
1
Not installed
fl ue gas fl ange
of each bend (m)
(C)
45°
Ø 41
Ø 43 (*)
1
Ø 45
Not installed
ENGLISH
C
D
fi g. 2
C
D
fi g. 2
load loss
90°
1,5
load loss
90°
1,5
load loss
90°
1,5
23
Tabla de contenido
loading

Este manual también es adecuado para:

Idrabagno 13 esiIdrabagno 17 esi

Tabla de contenido