EN
6 OPTION & ACCESSORY
6.1 HUMIDISTAT
Calibration is required every third year.
If not installed from factory, humidistat connection is required on the unit in order to connect the humidistat.
6.2
A 110-115V 60Hz version available for sites with no option to use the standard 230V 50Hz.
Selecting this option in combination with other electrical options may not be applicable. E.g., with pressure box. Consult DST for more information.
Seibu Giken DST
14
DR-40 T10, T16 EN.03