LAVOR Pro MAJOR Manual De Instrucciones página 19

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 43
see fig. D
⑧ dry steam / wet steam adjuster
⑨ Pressure gauge
⑩ Main switch ON/OFF
⑪ Boiler switch
⑫ + temperature adjuster
⑬ - temperature adjuster
⑭ Thermo regulator display
see fig. A
⑮ Steam gun + hose
⑯ Accessory
⑰ Detergent spray switch
see fig. E
⑱ inverter swich (mod. 12V)
⑱ battery pilot lights (mod. 12V)
> INSTALLATION AND START-UP
IMPORTANT: The machine installation en-
vironment should be kept at between 10°C and
35°C.
FUELLING
DIESEL
(see fig. A) 25 l
Fill the tank with the fuel indicated on the technical
data plate (Diesel)
In order not to damage the fuel pump, ensure that
the tank never empties while running.
• WARNING: Use of unsuitable fuel may result in
dangerous situations.
DETERGENT
(see fig. A) 2,4 l
Fill the detergent tank with the product recom-
mended for the task to be carried out.
• WARNING: Make use only of liquid detergent, do not
absolutely use acid or too much alkaline products. We
suggest you to make use of our products, which have
been studied for the use with washer machines.
WATER
see fig. A) 25 l
see section on "WATER SUPPLY"
only model : Major
- Connect the hose ③⑮,
- turn up the safety catch C2
- then open the steam tap ⑳.
WARNING: Danger from hot steam.
> 1ST START-UP (BEFORE INITIAL USE)
12 V battery model
- Ensure that the main switch ⑩ is set to (0) OFF
see fig. E
- Unscrew the 2 hand screws and lift the cover
away
- Connect the plug to the inverter.
- Position the inverter switch to (I) ON ⑱
- The illuminating "LED" lights up.
- Lower the cover and screw the hand screws back
up.
> Batteria
12 V battery model
- Check the battery charge level and recharge:
- ⑲ when the green "LED" is lit, the battery is
charged
- ⑲ when the yellow "LED" is lit, the battery is at
50% charge
- ⑲ when the red "LED" is lit, the battery is
discharged
To charge the battery:
- Place the switch to ⑩ (0) OFF
- Connect the plug to the electricity supply
- The charger charges the battery
IMPORTANT: The battery charger works also
with the main switch ⑩ in position (I) (II) (0).
IMPORTANT: Follow the battery manufacturer
use and safety manual.
> Sand blasting kit
only model " Graffiti Waster"
(see fig. FGHI)
Sand blasting work may be carried out with suitable
accessories.
- Fill the container with sand (sand not supplied),
sand for blasting, sand calibrated at Ø 0.5 mm..
19
EN
Tabla de contenido
loading

Tabla de contenido