1
Notes on the documentation
The following information is intended to help
you throughout the entire documentation.
Further documents apply in combination with
this installation manual.
We accept no liability for any damage
caused by failure to observe these instruc-
tions.
Note
Pay special attention to chapter 5 on
electrical installation in order to pre-
vent damage to the devices connect-
ed to the bus.
Assembly, electrical connection and initial
start-up may only be performed by an
approved heating engineering company.
Installation Manual for VR 32
Notes on the documentation 1
Other applicable documents
For the owner of the system:
Always follow the instruction manuals for the
various components when operating the sys-
tem.
For engineers:
The installation manuals for the various sys-
tem components must be observed during
assembly and start-up.
Note
Pay special attention to the installa-
tion manual for the boiler and the bus
modular controller.
1.1
Storage of the documents
Please pass on this installation manual to the
owner of the system so that he can keep it
available whenever it is required.
GB
3