2. Manual Station launch
- Select "Start station" and choose the station to be started with
ON/OFF and confirm by pressing OK.
- Then, set the manual watering run time and confirm by pressing OK.
Watering will start after a 2 second delay
WARNING:
- The old TBOS Control Modules start manually a station for the run time set-up in its program. For a manual
station launch, the associated valve MUST have a run time set-up.
- With TBOS-II Control Modules, the duration of a manual station run is customizable.
- Manual launch will not occur is there is no program in Control Module.
3. Manual Program launch
- Select "Start program" and choose one of the 3 programs A, B or C to be started using the ON/OFF keys and
confirm by pressing OK.
- Then, set the manual watering run time and confirm by pressing OK.
Reminder: a program consists of all stations operating in sequence
4. Irrigation Test on all stations
- Select " Test all stations" and confirm by pressing OK.
NOTE: This command does not exist for TBOS (1) - Sensor state does not affect this command.
ENG
19