Installation, Configuration and Operation Guide
of the SRW 01-UMC (Current Measurement Unit)
I. SAFETY INSTRUCTIONS
All the safety procedures described in the SRW 01 manual
must be followed. Failure to comply with the recommended safety
instructions may result in death, serious injury and considerable
material damage.
II. GENERAL INFORMATION
This guide orients the installation, configuration and operation
of the Current Measurement Unit (UMC) of the SRW 01 Smart Relay.
III. CONTENTS OF THE PACKAGE
- SRW 01 current measurement unit;
- Installation, configuration and operation guide.
1. INSTALLATION
The orientations and suggestions must be followed aiming to
the correct operation, and to people and equipment safety. The
procedures are divided into:
- Mechanical installation;
- Electrical installation.
3