Installation - BEGA BETEX 22 ELDi Manual Del Usario

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

3. Installation

Remove packing material and place the induction heater on a non-ferrous, stable, flat surface. The
box will normally contain the heater, a yoke or a set of yokes, the temperature probe, a pair of
heat-resistant gloves and a small container of lubricant.
Check the supply voltage and current meet the specifications on the type plate to be found on the
back of the machine.
As there are a large number of plug types, not every Bega induction heater is provided with a plug.
When the heater is not provided with a plug, a suitable plug has to be affixed by a qualified
electrician.
The wires should be connected as follows, there are 3 options depending on what type of cable
the heater is supplied with:
120V/230V 1 phase Heaters
Brown
Blue
Green/yellow
Black "1"
Black "2"
Green/yellow
400, 450, 500V 2 phase Heaters
Brown
Black
Green/yellow
Black "1"
Black "2"
Green/yellow
Make sure that the supply cable cannot come into contact with the bearing that is to be heated.
Insert the plug into a shockproof wall socket.
Use the main switch to switch on the current. The machine will emit a short bleep and the display
will show a "pre-set goal temperature" set by the manufacturer.
Connect the temperature probe by inserting the plug in the socket. Make sure that – and +
correspond on both plug and socket
The induction heater is now ready to be used in the temperature function mode.
Phase
Neutral
Ground
Neutral
Phase
Ground
Phase
Phase
Ground
Phase
Phase
Ground
120V/230V 1 phase Heaters (cCSAus)
Black
Phase
White
Neutral
Green
Ground
480, 600V 2 phase Heaters (cCSAus)
Black
Phase
Black
Phase
Green
Ground
8
Tabla de contenido
loading

Tabla de contenido