Ecobee 18 AWG Manual De Instalación página 9

Tabla de contenido
Two Stage Heat/Cool With 1 Stage Auxiliary Heat (Duel Fuel) with 2 Accessories
Equipment Interface
Y
W O/B
G
W2 AUX
R/H
R/C
ACC1
HRV
ACC1r
ACC2
Comp2
ACC2r
ACC3
Humidi er
ACC3r
Two Stage Heat/Cool Two Stage Auxiliary Heat (Duel Fuel) With One Accessory
Calor/frío de dos fases, calor auxiliar de una sola fase con dos accesorios
NOTE
Indicates jumper. Non Powered Accessories will require a jumper from RH | RC to ACC1, ACC2, ACC3 for a 24V feed.
factory installed jumper.
Diagram indicates 24V humidi er terminal. If your furnace control board does not have this, you must use a 110V/24V step down transformer.
Equipment Interface
Y
W O/B
G
W2 AUX
R/H
R/C
ACC1
Aux Heat
ACC1r
Stage 2
ACC2
Comp2
ACC2r
ACC3
Humidi er
ACC3r
NOTE
Indicates jumper. Non Powered Accessories will require a jumper from RH | RC to ACC1, ACC2, ACC3 for a 24V feed.
factory installed jumper.
Diagram indicates 24V humidi er terminal. If your furnace control board does not have this, you must use a 110V/24V step down transformer.
13
Instalación Del Termostato Inteligente ecobee
Furnace
Y
W
G
R
Hum
C
Furnace
Y1
W1
G
W2
R
Y2
Hum
C
CCalor/frío de dos fases, calor auxiliar de dos fases con un accesorio
Heat Pump
O
Y1
W2
Y2
R
C
Humidi er
Aux Heat
24V
Stage 2
C
Comp2
HRV
Dehumidi er
24V
C
NOTE
Indicates jumper. Non Powered Accessories will require a jumper from RH | RC to ACC1, ACC2, ACC3 for a 24V feed.
factory installed jumper.
Diagram indicates 24V humidi er terminal. If your furnace control board does not have this, you must use a 110V/24V step down transformer.
Heat Pump
O
Y1
W2
Y2
R
C
Humidi er
24V
C
NOTE
factory installed jumper must be removed for this con guration.
Non Powered Accessories will require a jumper from RH | RC to ACC1, ACC2, ACC3 for a 24V feed.
Two Stage Furnace (Carrier 58MVB) With Two Stage Heat Pump (Duel Fuel)
Equipment Interface
Furnace
W2
Y
Y1
W O/B
W/W2
G
Y/Y2
W2 AUX
R/H
R/C
Dhum
Com
Hum
ACC1
ACC1r
ACC2
ACC2r
ACC3
ACC3r
Dual Transformer – Single Stage Cooling With Boiler
Caldera de dos fases con deshumidificador y bomba de calor de dos fases
Equipment Interface
Y
W O/B
G
W2 AUX
R/H
R/C
ACC1
ACC1r
ACC2
ACC2r
ACC3
ACC3r
indica un puente de conexión. Los accesorios sin suministro eléctrico requieren un puente
de conexión de RH / RC a ACC1, ACC2, ACC3 para una alimentación de 24V.
Retire el puente de conexión instalado de fábrica
Instalación Del Termostato Inteligente ecobee
Heat Pump
O
Y1
W2
Y2
G
R
R
C
Humidi er
24V
C
Humidastat
Fan Coil
Air Conditioner
Y
24V
G
C
R
C
Boiler
R
C
W
Refrigeración de una sola fase con caldera
14
Tabla de contenido
loading

Productos relacionados para Ecobee 18 AWG

Este manual también es adecuado para:

20 awg22 awg

Tabla de contenido