Torque Table - Briggs & Stratton 100 Manual De Instalación Y Operador

Ocultar thumbs Ver también para 100:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

11. Connect conductor from transfer switch neutral terminal to
generator NEUTRAL terminal. Observe generator control panel
labeling for terminal identification.
12. Connect conductor from transfer switch "GND" terminal to
generator control panel "GROUND" terminal.
Assure generator equipment grounding conductor is connected per
applicable federal, state and local codes, standards and regulations.
13. Using minimum #14 AWG conductors, connect the transfer switch
"UTILITY 240 VAC" terminals to generator's "240 VAC" terminals
via two-pole connector supplied with generator.
14. Using minimum #18 AWG twisted pair copper or aluminum
conductors for GND and T/R and for+12VDC a single #18 AWG.
Refer to table below for maximum wire length per wire gauge sizes:
Maximum Wire Length
1 - 200 ft
(1 - 60 m)
201 - 300 ft
(61 - 91 m)
301 - 500 ft
(92 - 152 m)
Torque Terminal
J7 = 2.5 lb/in.
Generator Control Panel:
UTILITY A
UTILITY B
(1) No
(2) Comm
(3) NC
(4) TxRx
(5) TxRx Gnd
(6) + LED
(7) Gnd
(8) 12v DC
Located at
Transfer Switch
NOTICE: For this system to work, the generator controller needs
to have hardware and software version as mentioned below:
Hardware Revision or Higher
E3
When upgrading to ACCM board and Symphony 2
UTILITY A
Management System TxRx and TxRxGnd wires cannot be more
UTILITY B
than 200 ft. in length between transfer switch control board and
generator control panel.
8
Wire Gauge
18
16
14
C1
12VDC
TCRM
Software
Revision or
Higher
E1.00
®
Power
15. Tighten all wire connections/fasteners to proper torque. See label
inside transfer switch enclosure or values listed in remote module
installation instructions for proper
torque values.
The illustration on the following page shows a completed transfer switch
installation. Your actual layout will vary.
Illustration callouts are:
A - From utility watt-hour meter
B - Optional generator disconnect circuit breaker
C - Transfer switch enclosure
D - T/R and GND to Generator
E - TRCM
F - Neutral terminal
G - Neutral bus
H - Ground bus
J - Main distribution panel
K - UTILITY 240VAC to Generator
L - Two pin connector or Two pin terminal block at generator
M - Ten pin connector or Eight pin terminal block at generator
N - Generator circuit breaker
P - Generator
R - Generator Neutral terminal
S - Generator Ground terminal
T - Transfer switch ground terminal
U - Load connection to distribution panel
V - Utility disconnect circuit breaker
W - Utility connection
X - Generator connection (if no generator disconnect present)

Torque Table

Utility
250 lb-in.
50 lb-in.
Generator
(100A)
Neutral
250 lb-in.
Ground
Fuse Block
12 lb-in.
Control
(J10)
16. NOTE: Wires between generator and transfer switch need to be
enclosed in conduit.
250 lb-in.
(150/200A)
50 lb-in.
12 lb-in.
2.5 lb-in.
(J7)
BRIGGSandSTRATTON.COM
Tabla de contenido
loading

Este manual también es adecuado para:

150200

Tabla de contenido